Full Kitchen Remodel
The room stripped back and rebuilt, usually six to twelve weeks of construction once the cabinets arrive
Service Area
Katy is about twenty miles north of Sugar Land, and the city itself straddles the Fort Bend, Harris and Waller county lines, while the wider area people call Katy extends well beyond the city limits into all three. It is one of the largest concentrations of 1990s and 2000s suburban housing in the region, which makes the kitchen work here fairly predictable.
The characteristic Katy kitchen is in a two-storey from the 1990s or 2000s: reasonably large, open or half-open to a two-storey family room, with a soffit above the wall cabinets, a small island, and a cabinet run in a stained oak or maple that has aged out of fashion. The most common project is new or refaced cabinetry taken to the ceiling where the soffit permits, new counters, and lighting redone.
The soffit is the item to investigate early. Some are hollow drywall boxes that come out in an afternoon. Others carry HVAC trunk ducts to the second floor, a plumbing vent from an upstairs bathroom, or structure. Opening a small inspection hole before the cabinet order is placed is the difference between a plan that works and a change order.
Full remodels in this stock generally land at $45,000 to $95,000, and a refacing-plus-counters package on sound plywood boxes lands closer to $20,000 to $35,000. Because the cabinet runs in these houses are long, the per-linear-foot decision on cabinetry matters more here than it does in a small kitchen.
Permitting depends on whether the address is inside the City of Katy limits or in the unincorporated county, and which county it falls in. That is determined per address, not per neighbourhood name, and it is the first thing a contractor checks in this market.
A walkthrough at the house, then a written price split across cabinetry, counters, appliances and labor. The quote costs nothing either way.
Every scope below is priced for this market, with what drives the number.
The room stripped back and rebuilt, usually six to twelve weeks of construction once the cabinets arrive
New doors, drawer fronts and veneered face frames over cabinet boxes that are still sound, at roughly a third of replacement cost
Cabinetry built to the room rather than to a catalogue grid, which is what a two-storey Sugar Land kitchen with an immovable soffit usually needs
Templated after the cabinets are set, fabricated off site, and installed on a run that has been levelled first
Adding an island, or replacing one that is too small, too tall or in the wrong place for how the kitchen gets used
Taking down the wall between a closed 1980s kitchen and the family room, which is the single most common structural request in this market
Galley and townhome kitchens where every inch of run is spoken for and the win comes from storage rather than square footage
Texas does not license general contractors or remodelers. The trades are licensed, the city permit is the paper trail, and here is how to check what can be checked.
The Vertisol clays under Sugar Land swell and shrink seasonally, and the slab moves with them. A kitchen shows it first. Here is what is normal and what is not.
Interior work is generally outside what a declaration reaches. The dumpster, the parking, the work hours and anything touching an exterior wall usually are not.